THE TOTAL PROCESS FLOW CHART

Aluminum Ingots
Casting
Homogeneous
design
Mold
Extrusion
Aging
Oxidation
Electrophoresis
Dusting
Painting
Insulation
Test
Package
Product

The process flow

01. casting production process

Electrolytic Primary Aluminum
Measurement
Melting furnace
Ingredients
Smelting
Slag
Artificial Stirring
The First Refining
Sampling Analysis
Component Cdjustment
Artificial Stirring
The Second Refining
Slag
Sampling Analysis
Place The Insulation
Casting
Hanging Rod
Identify The Furnace Number

02. extrusion production process

Mold Heating
Aluminum Rod Heating
Sheng Mandrel Heating
Extrusion
Water, Air-cooled Quenching
Straightening
Length Cutting
Test
Artificial Aging
Test
Oxidation Plant
Spraying Workshop

03. oxidation production process

Inspection
Blank Shelves
Degreasing
Washed With Water
Washed With Water
Alkaline Corrosion
Washed With Water
Washed With Water
Neutralization
Washed With Water
Washed With Water
Pliers Material
Anodizing
Washed With Water
Electrolytic Coloring
Washed With Water
Washed With Water
Sealing
Washed With Water
Off The S helf
Inspection
Packaging
Storage

04. Electrophoresis production process

Inspection
Blank Shelves
Degreasing
Washed With Water
Alkaline Corrosion
Washed With Water
Washed With Water
Neutralization
Washed With Water
Pliers Material
Anodizing
Washed With Water
Washed With Water
Electrolytic Coloring
Washed With Water
Washed With Water
Pure Water Washing
Pure Hot Wash
Pure Water Washing
Electrophoresis
Pure Water Washing
Pure Water Washing
Cold Material
Curing
Off The Shelf
Inspection
Packaging
Storage

05. Powder coating process

Inspection
Blank Shelves
Degreasing
Washed With Water
Washed With Water
Etching
Washed With Water
Washed With Water
Washed With Water
Washed With Water
Hexavalent Chromium
Washed With Water
Washed With Water
Washed With Water
Washed With Water
Pure Water Washing
Dried
Baking
Lower Row
Inspection
On The Pieces
Blowing Dust
Spraying
Preheating
Curing
The Next Piece
Inspection
Packaging
Storage

06. Fluorocarbon spraying process

Inspection
Blank Shelves
Degreasing
Washed With Water
Washed With Water
Etching
Washed With Water
Washed With Water
Washed With Water
Washed With Water
Hexavalent Chromium
Washed With Water
Washed With Water
Washed With Water
Washed With Water
Pure Water Washing
Dried
Baking
Lower Row
Inspection
On The Pieces
Blowing Dust
Spray primer (A, B spray room)
Leveling
Spray paint (A, B spray room)
Leveling
Spray paint (A, B spray room)
Leveling
Curing
The Next Piece
Inspection
Packaging
Storage

07. Heat insulation profile process

① Wear Bar Thermal Insulation Material Process

Surface Treatment Of Aluminum Profiles
Open Teeth (Knurled)
Wear Insulation
Rolling
Inspection
Packaging
Storage

② Casting Insulation Profile Process

Surface Treatment Of Aluminum Profiles
Pouring
Curing
Cut The Bridge
Inspection
Packaging
Storage

The total process flow chart

design-Mold-Aluminum Ingots-Casting-Homogeneous-Extrusion-Aging-Oxidation-Electrophoresis-Dusting-Painting-Insulation-Test-Package-Product

The process flow

01. casting production process
Electrolytic Primary Aluminum-Measurement-Melting furnace-Ingredients-Smelting-Sampling Analysis-The First Refining-Artificial Stirring-Slag-Component Cdjustment-Artificial Stirring-The Second Refining-Slag-Sampling Analysis-Place The Insulation-Identify The Furnace Number-Hanging Rod-Casting
02. extrusion production process
Mold Heating-Aluminum Rod Heating-Sheng Mandrel Heating-Extrusion-Water, Air-cooled Quenching-Straightening-Length Cutting-Test-Artificial Aging-Test-Oxidation Plant-Spraying Workshop
03. oxidation production process
Inspection-Blank Shelves-Degreasing-Washed With Water-Washed With Water-Alkaline Corrosion-Washed With Water-Washed With Water-Neutralization-Washed With Water-Washed With Water-Pliers Material-Anodizing-Washed With Water-Electrolytic Coloring-Washed With Water-Washed With Water-Sealing-Washed With Water-Off The S helf-InspectionPackaging-Storage
04. Electrophoresis production process
Inspection-Blank Shelves-Degreasing-Washed With Water-Alkaline Corrosion-Washed With Water-Washed With Water-Neutralization-Washed With Water-Pliers Material-Anodizing-Washed With Water-Washed With Water-Electrolytic Coloring-Washed With Water-Washed With Water-Pure Water Washing-Pure Hot Wash-Pure Water Washing-Electrophoresis-Pure Water Washing-Pure Water Washing-Cold Material-Curing-Off The Shelf-Inspection-Packaging-Storage
05. Powder coating process
Inspection-Blank Shelves-Degreasing-Washed With Water-Washed With Water-Etching-Washed With Water-Washed With Water-Washed With Water-Washed With Water-Hexavalent Chromium-Washed With Water-Washed With Water-Washed With Water-Washed With Water-Pure Water Washing-Dried-Baking-Lower Row-Inspection-On The Pieces-Blowing Dust-Spraying-Preheating-Curing-The Next Piece-Inspection-Packaging-Storage
06. Fluorocarbon spraying process
Inspection-Blank Shelves-Degreasing-Washed With Water-Etching-Washed With Water-Washed With Water-Washed With Water-Washed With Water-Washed With Water-Hexavalent Chromium-Washed With Water-Washed With Water-Washed With Water-Washed With Water-Pure Water Washing-Dried-Baking-Lower Row-Inspection-On The Pieces-Blowing Dust-Spray primer (A, B spray room)-Leveling-Spray paint (A, B spray room)-Leveling-Spray paint (A, B spray room)-Leveling-Curing-The Next Piece-Inspection-Packaging-Storage
07. Heat insulation profile process
① Wear Bar Thermal Insulation Material Process Surface Treatment Of Aluminum Profiles-Open Teeth (Knurled)-Wear Insulation-Rolling-Inspection-Packaging-Storage
② Casting Insulation Profile Process Surface Treatment Of Aluminum Profiles-Pouring-Curing-Cut The Bridge-Inspection-Packaging-Storage